01Toronto Granite
5.0out of 5273 reviews
5151 Everest Dr #1, MississaugaCountertop Installation
85/100 Countertop Installers Score
- Says it has been going since 2003
Newest review
4 weeks ago
Open
6 days a week
Photos
4 on file
Last updated: By The Slab Desk
Countertop installation in the Toronto area runs $4,500 to $7,500 per project, as published by Teccorp Stone (Toronto kitchen countertop cost guide). Material is the single biggest factor, then square footage, edge profile, seam count, and cut-outs for sinks and cooktops. Tearing out and disposing of the old surface, walk-up stairs, tight access and a same-day rip-and-replace all add labour. GTA fabricators normally quote before 13% HST.

These are not Countertop Installers estimates and they are not a market survey. Every range below rests on 6 independent companies publishing prices on 7 of their own pages, read off those pages in August 2026: Teccorp Stone, Stone Valley Countertops, Stone Wizards, Toronto General Contractors, Better Marble, Josh Kitchen. Most are GTA fabricators and suppliers, and several are listed in this directory. Read each one as what that company advertises, not as what a job settles at: an advertised range is written to win the work, a real quote is measured on site. Where two companies disagree, each range is published under its own company's name rather than merged into a wider band neither of them quotes.
| Item | Published range | Unit | Published by |
|---|---|---|---|
| Standard family kitchen, complete countertop replacement project (Toronto)Teccorp Stone publishes this as a planning range, not a quotation: it says the final quote depends on material, slab quantity, fabrication and installation scope. | $4,500–$7,500 | per project (CAD) | Teccorp Stone (Toronto kitchen countertop cost guide) |
| Small condo kitchen, complete countertop replacement project (GTA)Stone Valley's own example project for a small condo kitchen. Teccorp Stone publishes a different band for the same job, $2,800 to $4,500, listed separately below rather than merged into one wider range. | $2,400–$3,800 | per project (CAD) | Stone Valley Countertops (Mississauga, GTA quartz pricing guide) |
| Small condo kitchen, complete countertop replacement project (Toronto)Teccorp Stone publishes this as a planning range, not a quotation. Stone Valley Countertops publishes a lower band for the same job, $2,400 to $3,800, listed separately above rather than merged into one wider range. | $2,800–$4,500 | per project (CAD) | Teccorp Stone (Toronto kitchen countertop cost guide) |
| Full-service quartz countertop installation, all-in (Toronto)Stone Wizards' own 2026 installed price. It says most of its Select projects land between $45 and $95 per square foot, so the $180 top of the range is premium and designer brands rather than a common outcome. | $45–$180 | per sq ft installed (CAD) | Stone Wizards (Toronto, 2026 pricing guide) |
| Full-service quartz installation, fabricator planning range (Toronto)Teccorp Stone calls this a planning range rather than a fixed quotation, and writes the top end as $140 or more. | $75–$140 | per sq ft installed (CAD) | Teccorp Stone (Toronto quartz installed pricing breakdown, 2026) |
| Granite countertop, templated, fabricated and installed (Toronto)Including installation. Toronto General Contractors adds that the cost rises for rare colours or slabs with dramatic veining, and that granite needs periodic sealing. | $75–$175 | per sq ft installed (CAD) | Toronto General Contractors (Toronto countertop cost guide) |
| Marble countertop, templated, fabricated and installed (GTA)Better Marble states this includes the slab, fabrication, installation and basic edge profiles. Its own table adds HST at 13% on top. | $90–$250 | per sq ft installed (CAD) | Better Marble (Toronto/GTA, 2025) |
| Installation labour component only, stone countertop (GTA)The installation labour line only, from Better Marble's itemized table. It is already inside the all-in marble range above, so do not add the two together. | $50–$100 | per sq ft (CAD) | Better Marble (Toronto/GTA, 2025 itemized breakdown) |
| Fabrication, cutting and shaping (GTA)Priced per linear foot of cutting and shaping in Better Marble's itemized table, not per square foot, and already inside its all-in installed range. | $10–$40 | per linear ft (CAD) | Better Marble (Toronto/GTA, 2025 itemized breakdown) |
| Tear-out and disposal of an existing countertop (Toronto)Josh Kitchen prices this as professional removal including handling plumbing and electrical connections where needed. Better Marble publishes a lower $125 to $250 for the same line, listed separately below. | $200–$500 | per removal (CAD) | Josh Kitchen (Toronto countertop replacement guide) |
| Mitred waterfall edge panel (per island side)Per island side. Stone Valley lists the standard eased edge as included and charges the mitred waterfall as an addition on top of the countertop price. | $900–$1,800 | per panel (CAD) | Stone Valley Countertops (GTA pricing guide) |
| Tear-out and disposal of an existing countertop (GTA)A line in Better Marble's itemized marble table. Josh Kitchen publishes CAD 200 to 500 for the same removal, listed separately above rather than merged into one wider range. | $125–$250 | per removal (CAD) | Better Marble (Toronto/GTA, 2025 itemized breakdown) |
Far enough that a reader with two quotes should not assume one of them is wrong. The drawing below is the same rows as the table above, one axis per unit, so a square-foot rate is never set against a per cut-out fee. Each bar runs from the low figure that company advertises to its high figure, and the bar is drawn from those two numbers and nothing else. On the per sq ft installed (CAD) figures the two furthest apart are $45–$180 and $90–$250, from Stone Wizards (Toronto, 2026 pricing guide) and Better Marble (Toronto/GTA, 2025). Neither is the market rate, because this site has not got one and has not built one.
Published by Stone Wizards (Toronto, 2026 pricing guide). Stone Wizards' own 2026 installed price. It says most of its Select projects land between $45 and $95 per square foot, so the $180 top of the range is premium and designer brands rather than a common outcome.
Published by Teccorp Stone (Toronto quartz installed pricing breakdown, 2026). Teccorp Stone calls this a planning range rather than a fixed quotation, and writes the top end as $140 or more.
Published by Toronto General Contractors (Toronto countertop cost guide). Including installation. Toronto General Contractors adds that the cost rises for rare colours or slabs with dramatic veining, and that granite needs periodic sealing.
Published by Better Marble (Toronto/GTA, 2025). Better Marble states this includes the slab, fabrication, installation and basic edge profiles. Its own table adds HST at 13% on top.
Published by Stone Valley Countertops (Mississauga, GTA quartz pricing guide). Stone Valley's own example project for a small condo kitchen. Teccorp Stone publishes a different band for the same job, $2,800 to $4,500, listed separately below rather than merged into one wider range.
Published by Teccorp Stone (Toronto kitchen countertop cost guide). Teccorp Stone publishes this as a planning range, not a quotation. Stone Valley Countertops publishes a lower band for the same job, $2,400 to $3,800, listed separately above rather than merged into one wider range.
Published by Teccorp Stone (Toronto kitchen countertop cost guide). Teccorp Stone publishes this as a planning range, not a quotation: it says the final quote depends on material, slab quantity, fabrication and installation scope.
Published by Better Marble (Toronto/GTA, 2025 itemized breakdown). A line in Better Marble's itemized marble table. Josh Kitchen publishes CAD 200 to 500 for the same removal, listed separately above rather than merged into one wider range.
Published by Josh Kitchen (Toronto countertop replacement guide). Josh Kitchen prices this as professional removal including handling plumbing and electrical connections where needed. Better Marble publishes a lower $125 to $250 for the same line, listed separately below.
3 rows in the table are not drawn above. Each is the only figure on this page priced that way, so there is nothing on the same unit to set them against, and one bar alone on an axis says less than the row already does.
Nothing can be measured until the base cabinets and the island are installed, secured and levelled. This is why a countertop cannot be ordered at the same time as the kitchen, and why unlevel cabinets buy you a second visit.
No company on this page prices this stage. It is the homeowner's or the cabinet installer's, and it sets the date everything after it hangs off.
The fabricator makes a physical or digital pattern of the finished cabinets. That pattern, not the kitchen drawing, is what the slab gets cut to.
None of the companies on this page bills the template visit as its own line. It sits inside the per square foot rates below.
Almost always quoted separately from the new top. What is coming off decides the price: laminate pulls in about half an hour, stone can take half a day, and plumbing or electrical connections have to be handled.
Cutting and shaping the slab, polishing the edge and cutting the openings. The plain eased edge is normally in the price and everything else is an addition, which is where two quotes on the same kitchen start to separate.
Setting the pieces, joining them and levelling. An L-shape needs a corner seam, an island is a second install surface, and 2cm slabs often need plywood support underneath.
What the companies on this page publish when they price everything above as a single project figure. Two of them price the same small condo kitchen differently, and both numbers are here rather than averaged.
Scope drives it more than material does. The list below is ordered by how much each one moves a countertop installation quote in Toronto, and every line names the company that published the figure beside it, so you can read a quote and see where the money goes.
Ontario rules and Toronto's climate change the math in ways national price guides miss. Here is what applies locally, from HST to permits to freeze-thaw.
You can keep countertop installation costs down without cutting the parts that matter. These are the levers GTA homeowners actually use, each tied to a real number above.
From 6 companies' own published pages, and nowhere else. Countertop Installersdid not survey anyone and did not model, average or interpolate a single figure. Every price above was read off a named company's page in August 2026, is reproduced with that company named beside it, and carries the caveat that company attached to it. Several of those companies compete with each other and are listed in this directory, so no single one of these ranges is the market rate. Here is what reconciling them turned up.
Countertop Installers tracks 300 countertop installation companies across the Greater Toronto Area, rated 4.7★ on average. The three below rank highest on one published score out of 100, based on Countertop Installers' analysis of 300 GTA businesses, August 2026.
5.0out of 5273 reviews
5151 Everest Dr #1, MississaugaCountertop Installation
85/100 Countertop Installers Score
Newest review
4 weeks ago
Open
6 days a week
Photos
4 on file
5.0out of 578 reviews
390 Edgeley Blvd, ConcordCountertop Installation
82/100 Countertop Installers Score
Newest review
5 months ago
Open
7 days
Photos
4 on file
4.9out of 5103 reviews
80 Dufflaw Rd, North YorkCountertop Installation
81/100 Countertop Installers Score
Newest review
8 months ago
Open
6 days a week
Photos
4 on file
Like this. Every photograph below was taken by the shop under it, of a job that shop did, and it links through to that shop's profile. Countertop Installers holds 3,205 of these across 869 businesses and took none of them. A finished edge, a seam you can or cannot see, and how a slab meets a cabinet run are the things a quote is actually about, and they are quicker to judge in a photograph than in a paragraph.
Yes, and without giving anyone an email address first. A published range tells you the shape of the price; these put your own measurements against the same researched figures, line by line.
These are the words that decide what a number covers. Each one is defined here because this guide uses it above, not because a glossary needs filling.
These three quote the most fabricators in common with this page, so they are the ones that let you check a number against a second material or a second scope.